Measuring Our Public Utility in Saillans & the Valley
Our commitment to the public interest is evidenced by tangible, verifiable field results achieved through collective civic commitment.
Surveyed Monuments
Detailed architectural and historical diagnostic files compiled for municipal authorities.
Dry-Stone Walls
Linear meters of agricultural and pathway retaining terraces restored and stabilized.
Volunteer Hours
Direct pro-bono physical labor dedicated to civic site conservation in the field.
Citizens Reached
Participants attending free guided tours, school programs, and public conferences.
2025–2026 Resource Allocation & Grant Utilization
An exhaustive, line-by-line overview of all funding sources and operational expenditures, showing exactly how funds are utilized.
In strict compliance with French accounting regulations for non-profit entities (Plan Comptable Associatif), our accounts are audited annually by an independent internal oversight committee before being presented for a public vote at our General Assembly in Saillans. We maintain zero commercial revenues and zero debt.
1. Operational Revenues (Total: €14,850.00)
| Funding Source | Origin & Nature | Percentage | Amount (€) |
|---|---|---|---|
| Public Municipal Subsidies | Commune of Saillans & Intercommunal Cultural Fund (Assigned project grants) | 42.4% | €6,300.00 |
| Civic Membership Dues | Annual voluntary dues from 124 local community members (€20/member average) | 16.7% | €2,480.00 |
| Philanthropic Heritage Grants | Regional heritage foundation assistance for Saint-Géry washhouse project | 26.9% | €4,000.00 |
| Individual Civic Donations | Voluntary pro-bono public contributions from valley residents & visitors | 14.0% | €2,070.00 |
| TOTAL REVENUE | 100% Non-Commercial Public Benefit Funding | 100.0% | €14,850.00 |
2. Operational Expenditures (Total: €14,850.00)
| Expenditure Category | Operational Description | Percentage | Amount (€) |
|---|---|---|---|
| Masonry & Restoration Materials | Local hydraulic lime, sand, quarry stone transport, timber beams for washhouse | 48.5% | €7,202.25 |
| Safety Gear & Tooling | Helmets, gloves, eye protection, wheelbarrows, scaffolding hire, first-aid kits | 19.2% | €2,851.20 |
| Educational & Tour Publishing | Printing free historical guidebooks, school discovery leaflets & exhibition boards | 14.8% | €2,197.80 |
| Archival Research & Digitization | Microfilm scanning fees, historical cadastral prints, oral archive recording gear | 8.5% | €1,262.25 |
| Statutory Administrative & Insurance | Non-profit civil liability insurance, bank administration fees, web hosting | 9.0% | €1,336.50 |
| TOTAL EXPENDITURE | Zero Executive Salaries • Zero Dividends • Zero Private Benefit | 100.0% | €14,850.00 |
Budget Allocation Visual Breakdown
✅ Auditor Compliance Certificate
"We, the elected audit commissioners of PATRIMOINE AU PAYS DES TROIS BECS, certify that the association’s books and cash registries for the operating cycle ending December 31, 2025, have been comprehensively verified. The records reflect complete accuracy, absolute compliance with the Association 1901 statutory requirements, and confirm that all funds have been strictly expended in accordance with the public interest goals of the association."
Signed at Saillans on January 18, 2026 — Michel Ravel, Treasurer & Internal Audit Committee.
Case Study: The Restoration of the Vellan Retaining Terrace
How €1,850 in public grant funding combined with 420 volunteer hours saved a crucial rural thoroughfare from complete washout.
In November 2024, extreme rainfall destabilized a 35-meter section of seventeenth-century dry-stone terrace along the primary pedestrian circuit connecting Saillans to the high pastures of the Vellan ridge. Commercial repair bids estimated the cost at over €18,000—a sum far beyond the municipal trail maintenance budget.
PATRIMOINE AU PAYS DES TROIS BECS stepped forward with a civic partnership solution. The municipality supplied safety fencing and quarry gravel for drainage, while our association organized three participatory volunteer workcamps supervised by retired stone mason Jean-Pierre Mercier.
Over six weekends, 28 community volunteers cleared debris, salvaged original limestone blocks from the slope, and reconstructed the terrace to historic standards. Total material cost to the public was just €1,850, saving taxpayer resources while forging lifelong bonds of neighborhood solidarity.